Travel Industry News at TravelNewsAsia.com since 1997. Interviews, podcasts, videos, pictures and more

Search Travel News Asia for: Assembly

Search Results
Your search for Assembly found the following documents (of 52086 documents searched):
Displaying documents 121-128 of 5541, with best matches first:

121. Fifth and Final A350 XWB Test Aircraft Enters Final Assembly Line
MSN5 is the second of the A350 flight test aircraft that will feature a passenger cabin. This aircraft will fly for the first time in Spring 2014 and will be used essentially to perform cabin related flight tests. It will also participate in the Early Long Flights where the passengers are Airbus employees. This allows the cabin and related systems to be submitted to near realistic
122. Mitsubishi Takes Delivery of First PurePower PW1200G Engine
Mitsubishi Aircraft Corporation has taken delivery of its first PurePower PW1200G engine at the Mitsubishi Regional Jet’s (MRJ) final-assembly factory in Aichi Prefecture, Japan. Pratt & Whitney shipped the PurePower engine in preparation of being mounted on the first MRJ flight test aircraft
123. Airbus Starts Manufacturing A220 in USA
Airbus has officially started manufacturing the A220 (formerly the Bombardier C Series) in the United States of America. The first team of A220 production workers began work at Airbus’ Mobile, Alabama-based production facility following their recent return from on-the-job training in Mirabel, Quebec, Canada, where the A220 programme and primary final assembly line are located.
124. Airbus Rolls Out First A321neo ACF
Airbus has completed assembly of the first A321neo ACF (Airbus Cabin Flex) at its facilities in Hamburg, Germany. The aircraft, powered by CFM LEAP-1A engines, will undergo ground tests prior to its scheduled first flight in the coming weeks. First delivery of an A321neo ACF to a customer is scheduled for mid-2018.
125. United Airlines’ First Boeing 787-9 Rolls Out of Factory
United Airlines’ first Boeing 787-9 Dreamliner rolled out of final assembly at Boeing’s Everett, Wash., facility, on Tuesday evening. The Boeing 787-9 Dreamliner is the second and newest member of the 787 family. With the fuselage stretched 20 feet longer than the 787-8, United’s 787-9 will fly more than 30 additional passengers and up to 300 nautical miles farther. United is the N
126. Delays hit Boeing 787 Dreamliners
Delays hit Boeing 787 Dreamliners. Boeing has confirmed a six-month delay in its planned initial deliveries of the 787 Dreamliner due, it says, to continued challenges completing assembly of the first airplanes. Deliveries of the Dreamliner are now slated to begin in late November or December 2008, versus an original target of May 2008. The first flight is now anticipated around th
127. Air Canada's First Airbus A220-300 Completes Maiden Flight
Air Canada's first Airbus A220-300 has completed its inaugural test flight from the Mirabel A220 final assembly line in Canada. The first of 45 aircraft for Air Canada is scheduled to be delivered to the Montreal-based airline in the coming weeks.
128. Norway’s First P-8A Poseidon Aircraft Moves into Assembly
The first P-8A Poseidon fuselage for Norway arrived at Boeing facilities in Renton, Washington, from Spirit AeroSystems in Wichita, Kansas, on Monday. The delivery marks a major milestone in the production of the first of five Poseidons for the Royal Norwegian Air Force (Luftforsvaret). Published by TravelNewsAsia.com on 13 April 2021.

Documents 121-128 of 5541 displayed.

Results Pages: [ << Previous ] 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 [ Next >> ]

Travel News Asia - Home Page

Advertising
Advertising
Contact Details | Privacy | About Us | TravelNewsAsia.com Copyright © 1997 - 2024 - TravelNewsAsia.com - All rights reserved.